Botanical Place Retirement Village,
West Byfleet
.png)
A bespoke architectural metalwork package spanning multiple building zones, interfaces and installation requirements.
Client
Retirement Villages
Group
Location
West Byfleet, Surrey
Package size
£500k
Overview
LockMetal was appointed by Higgins Partnerships to design, manufacture and install a £500,000 architectural metalwork package for Botanical Place, a two acre retirement village providing 197 high quality homes.
Working across three blocks, the package brought together a range of bespoke building-envelope details, including secret-fix aluminium cappings, rainwater goods, ancillary flashings and low-level canopy elements.
With multiple building zones, interfaces and installation requirements to coordinate, the project called for detailed design input and careful planning to ensure each component integrated seamlessly with the dominant facade material.
The challenge
The scale and variety of the package presented a number of technical and coordination challenges. Rather than a single repetitive design/installation, the work involved different roof areas, inset balconies, terraces and canopy details, each with its own requirements and interfaces.
Cappings needed to accommodate balustrade penetrations and changes in level, while incorporating appropriate support boards, brackets, EPDM interfaces and cover trims and an effective rainwater management solution was required.
As the project progressed additional details required LockMetal’s involvement and expertise including canopy flashings and strengthening requirements. To manage all this, tight coordination between the design, manufacture and installation teams was needed to achieve the required finish and keep the works aligned with the wider construction programme.
.jpg)
.jpg)
The solution
Chris Homewood, Project Director at Higgins Partnerships, described this project as one of its most challenging and thus demanded a high level of technical input, product quality and programme management. Having worked with LockMetal previously, this is who he turned to again.
The project called for a coordinated architectural metalwork package, with LockMetal drawing on its design and manufacturing expertise to develop bespoke components and overcome complex interfaces across the development, ensuring the various elements integrated seamlessly with the wider construction.
Secret-fix PPC aluminium cappings were manufactured for the roof areas, podium and inset balconies, with associated corners, stop ends and support details. Particular attention was given to junctions and penetrations, including bespoke detailing around balustrades, where additional brackets, notching and cover trims helped achieve a considered finish.
The rainwater package incorporated RF30, RF40 and RF60 pipe components, alongside box hoppers, clips, branches, elbows, adapters, spigot connections and drain terminations to suit the different building areas. Ancillary flashings and low-level canopy details completed the scope, with further detailing developed as requirements evolved on site.
Throughout delivery, LockMetal worked closely with Higgins Partnerships to coordinate the package, respond to developing requirements and maintain progress against key programme milestones and maintained the required health and safety standards throughout.
Products delivered
-
Roof and balcony cappings: secret-fix PPC aluminium cappings to roof areas, the podium and inset balconies.
-
Capping accessories: bespoke corners, stop ends, support and cover boards, and Class B EPDM interfaces.
-
Balustrade details: additional support brackets, notching and cover trims to accommodate penetrations.
-
Rainwater goods: RF30, RF40 and RF60 pipework, including clips, box hoppers, branches, elbows, adapters, spigot connections and drain terminations.
-
Ancillary flashings: bespoke flashings, including canopy flashings.
-
Canopy elements: low-level canopy components and associated detailing.
Results
The completed development showcases LockMetal's ability to manage complex architectural metalwork packages, combining bespoke detailing, reliable delivery and a collaborative approach from design through to installation.
It demonstrates the importance of specialist design expertise and close collaboration when delivering complex building-envelope packages. From the integration of roof and balcony cappings to the coordination of rainwater systems and ancillary details, each element needed to work with the surrounding construction while meeting the required standards of finish and performance.
Despite the complexities the team achieved the necessary programme milestones and maintained the required health and safety standards throughout.

"Having worked with LockMetal on several projects before, I'd say West Byfleet was probably our most challenging one yet. But their design input and product quality met the high standards required for this project. They hit all the necessary programme milestones and maintained health and safety standards throughout."
Christopher Homewood MCIOB - Project Director, Higgins Partnerships