Our Work

Gascoigne East Phase

Gascoigne East Phase

 

 

Project Name: Gascoigne East Phase

Project Location: Barking

Customer: Bouygues (UK) Ltd

Package Size: £500,000 – £750,000

 

Description:

The original design of the walkway soffits was cumbersome but very cheep. However, the mock-up was rejected by the design team on visual and durability grounds. Lockmetal were able to come in late in the process and propose a simple, effective and cost efficient solution. A further mock-up and detailed scheduling meant the program and project were back on track without harming the budget.

 

Products designed and installed:

ppc Perforated Walkway Soffits, Solid Walkway Soffits, ppc pressed aluminium soffit system, ppc aluminium cladding system.